Sherman Oaks Fashion Square on Metro's Rail Yard List
Published on November 14, 2026 by Leegie Parker
Last updated on November 15, 2026
Leegie Parker | Real Estate Advisor | DRE 01020534 | Compass | Leegie.com

Quick Answer Metro is studying Sherman Oaks Fashion Square on Riverside Drive as one of five possible sites for a train maintenance and storage facility that would serve the planned Sepulveda Transit Corridor subway. No site has been chosen. Public comments are due Wednesday, November 18, 2026, and the last in-person meeting is Monday, November 16 in Sherman Oaks. |
Sherman Oaks Fashion Square is on a short list of five places where Metro could build the rail yard for its future Valley-to-Westside subway, and nothing has been decided yet. I am writing this because almost none of my friends and clients in Sherman Oaks and Van Nuys had heard a word about it until a flyer started circulating on Instagram this week.
I have shopped at that mall for years. When my son Wyatt was a baby, Fashion Square is where we went for his picture with Santa. And just recently I showed homes in the surrounding neighborhood to buyers who loved being so close to the mall, Trader Joe's, and the other businesses along Riverside Drive.
So this one is personal for me. The deadline to comment is Wednesday, November 18, 2026, and I want you to have the facts before then.
In this post
What is Metro proposing at Sherman Oaks Fashion Square?
Metro has listed the mall as Option 1 among five candidate sites for a maintenance and storage facility, which is the yard where subway trains are parked, cleaned, and repaired. Metro's description of the site is one line: "At the existing Westfield Fashion Sq on Riverside Dr."
The yard would serve the Sepulveda Transit Corridor, the planned rail line between the San Fernando Valley and the Westside. According to Metro's project FAQ, the Metro Board selected the route in January 2026. In the Valley it is an underground subway running beneath Van Nuys Boulevard, with the Sherman Oaks station planned at Ventura and Van Nuys boulevards.
So the station is not at the mall. The rail yard is a separate piece of the project, and where it goes is the part that is open for public comment right now
Has Metro decided to tear down the mall?
No. Metro has not selected any site, and Fashion Square is open for business today. Some of the posts going around say the decision is already made, and that is not what Metro has published.
What we know:
• Five candidate sites are on the list, and none has been chosen.
• The yard location will be studied in a new environmental document called a Recirculated Draft Environmental Impact Report, per Metro's FAQ.
• Public comments on the site options are due November 18, 2026.
What we do not know yet:
• How much of the mall property a yard would use. Metro has not published a footprint or acreage for Option 1.
• What would happen to the stores, the parking, or the jobs there.
• When anything would be built. Metro says an updated construction timeline will be shared once it is available.
The flyer circulating on Instagram describes a half-mile-long facility running 24 hours a day. Metro's scoping presentation does not give a size or hours for any site. Its maps note that site locations, sizes, and configurations will be refined as design progresses, so ask Metro to spell those out in your comment.
Where are the other four sites?
The other four candidate sites run from Oxnard Street north through Van Nuys. Metro says the yard sites in its earlier environmental report sat outside the first phase of the line and conflicted with other infrastructure, which is why there is a new list. Here are all five from Metro's scoping presentation.
Option | Location |
1 | Westfield Fashion Square, on Riverside Drive in Sherman Oaks |
2 | Along Oxnard Street, between Kester Avenue and Sepulveda Boulevard |
3 | Existing Metro parking and adjacent properties near the G Line Van Nuys Station |
4 | North of Victory Boulevard, just west of Van Nuys Boulevard |
5 | The Plant shopping center and adjacent properties, east of Van Nuys Boulevard |
One detail from Metro's presentation is worth knowing. The line would open in phases, starting with an 8.4-mile segment from the G Line in Van Nuys to Wilshire/Westwood. Fashion Square (Option 1) and Oxnard Street (Option 2) are each shown as able to serve that first segment and then expand for the full 12.3-mile line. Options 3 and 4 could serve the first segment, but would need Option 5 added for the full line.
If you live in Van Nuys, this is your conversation too. Four of the five options are close to you.
How do you comment before the November 18 deadline?
You can comment in person, online, by email, by phone, or by mail, and every comment has to reach Metro by Wednesday, November 18, 2026. The details are on Metro's project page.
• In person: Monday, November 16, 5:30 to 7:30 pm, at the Sherman Oaks East Valley Adult Center, 5056 Van Nuys Boulevard, Sherman Oaks, CA 91403. This is the last scheduled meeting.
• Email: sepulvedatransit@metro.net
• Phone: 213.922.7375
• Mail: Peter Carter, Project Manager, Metro, One Gateway Plaza, Mail Stop 99-22-6, Los Angeles, CA 90012
• Online: Metro's comment form
Metro's own slides say the more specific your comment is, the better its teams can consider it. Name the option number, say where you live in relation to it, and list what you want studied, such as noise, lighting, traffic on Riverside Drive, or the economic impact of losing local businesses. If you speak on Monday, plan on about two minutes, and send a written comment too.
This is also not the last chance to weigh in. Metro's presentation says formal environmental review comes next, with more comment opportunities, but getting on the record now is how concerns make it into what gets studied.
A letter you can copy and paste
If you oppose Option 1, here is a letter you are welcome to use. Change it to fit your own situation, because a letter in your own words always lands better.
To: sepulvedatransit@metro.net Subject: Sepulveda Transit Corridor Scoping Comment, Oppose Option 1 Maintenance Yard at Westfield Fashion Square Dear Mr. Carter and the Sepulveda Transit Corridor Project Team, I am writing as a local resident to submit my formal scoping comment regarding the Sepulveda Transit Corridor Project. Specifically, I strongly oppose Option 1 ("At the existing Westfield Fashion Sq on Riverside Dr") as a proposed location for the project's Maintenance and Storage Facility (MSF). Westfield Fashion Square is a vital commercial, economic, and community hub for Sherman Oaks and the surrounding San Fernando Valley. Replacing this long-standing retail center with a heavy industrial rail yard would eliminate essential local jobs, reduce significant sales tax revenue for the city, and permanently alter the character of our residential neighborhood. Furthermore, placing a 24-hour train maintenance and storage facility directly adjacent to established residential streets, local schools, and the Los Angeles River raises serious concerns regarding noise pollution, artificial lighting, vibrations, and increased traffic congestion along Riverside Drive and Hazeltine Avenue. I urge LA Metro to remove Option 1 from consideration and focus on alternative maintenance yard sites that are already zoned for heavy industrial use and will not displace a thriving community anchor. Thank you for recording my opposition in the official environmental scoping record and for considering the well-being of the Sherman Oaks community. Sincerely, [Your name, street or neighborhood, and ZIP code] |
What could this mean for Sherman Oaks home values?
Nothing changes today, because this is a study and not an approved project. No one can tell you what a home will sell for based on a line item in a scoping document, and I would be wary of anyone who claims to.
Here is what I am watching. The buyers I recently took through homes near the mall were drawn to that pocket because daily life is easy there: groceries, shopping, and dinner are minutes away. A retail center and an industrial rail yard are very different neighbors, so I expect buyers looking in this part of Sherman Oaks to start asking about Option 1.
If you are thinking about selling a home in the Valley near any of these five sites, the best thing you can do is know the facts so you can answer those questions calmly. If you are buying a home in the San Fernando Valley, add this to your list of things to ask about, and keep it in perspective. If you are still deciding between neighborhoods, I compared Sherman Oaks and Studio City side by side in an earlier post.
Where do I stand on Option 1?
I oppose putting the yard at Fashion Square. A rail line between the Valley and the Westside has real support, and a line like that needs a yard somewhere. Every site on the list affects somebody, and I do not want to wave that away.
My view is that a facility like this belongs on land that is already zoned for industrial use, not on the site of a shopping center that has anchored this neighborhood since 1962. You may see it differently, and that is fine. What matters is that the people who live here know it is happening and get their comments in before the deadline.
Frequently Asked Questions
Is Westfield Fashion Square in Sherman Oaks closing?
No. Westfield Fashion Square is open, and Metro has not decided to build anything there. The mall is one of five candidate sites Metro is studying for a train maintenance and storage facility, and no site has been selected.
When is the deadline to comment on the Metro maintenance facility sites?
Comments are due Wednesday, November 18, 2026. You can comment at the November 16 meeting in Sherman Oaks, by email at sepulvedatransit@metro.net, by phone at 213.922.7375, by mail, or through the online form on Metro's Sepulveda Transit Corridor project page.
Where will the Sherman Oaks station on the Sepulveda Transit Corridor be?
The Sherman Oaks station is planned at Ventura and Van Nuys boulevards. The route the Metro Board selected in January 2026 is an underground subway beneath Van Nuys Boulevard in the Valley. The station is not planned for the Fashion Square site.
What is a train maintenance and storage facility?
A maintenance and storage facility is the rail yard where transit trains are parked, cleaned, and repaired when they are not carrying passengers. Every rail line needs one. Metro is studying five possible locations for the yard that would serve the Sepulveda Transit Corridor.
Key Takeaways • Metro is studying Sherman Oaks Fashion Square on Riverside Drive as one of five possible sites for a train maintenance and storage facility. No site has been selected. • The other four candidate sites are along Oxnard Street between Kester and Sepulveda, near the G Line Van Nuys Station, north of Victory Boulevard west of Van Nuys Boulevard, and at The Plant shopping center. • Metro has not published how much of the mall property a yard would use or what would happen to the businesses there. • Fashion Square (Option 1) and Oxnard Street (Option 2) are the only sites Metro shows as able to serve the full 12.3-mile line on their own. Options 3 and 4 would need Option 5 added. • The planned Sherman Oaks subway station is at Ventura and Van Nuys boulevards, not at the mall. Public comments are due Wednesday, November 18, 2026. The last in-person meeting is Monday, November 16, 5:30 to 7:30 pm, at 5056 Van Nuys Boulevard in Sherman Oaks. |
Make Your Voice Heard, Then Let's Talk
If you care about what happens at Fashion Square, go to Monday's meeting or send your comment by Wednesday, November 18. It takes five minutes, and it goes into the official record.
And if you want to talk through what this could mean for your home or your search in Sherman Oaks, Van Nuys, or anywhere in the San Fernando Valley or on the Westside, I would love to hear from you. Call or text me at 310-739-9202, or email Leegie@Leegie.com. I will give you a thoughtful, grounded take on where you stand.
Leegie Parker
Real Estate Advisor, Compass
DRE 01020534
310-739-9202 | Leegie@Leegie.com | Leegie.com




Comments